MIL-DTL-62337C(AT)
6.3 Subject term (key word) listing.
Combat vehicle
Dry-type
Dust efficiency
Dust feed
Fender-mounted
Filter element
Flow rate
M60 series tank
6.4 First article inspection. When requiring a first article inspection, contracting
documents should provide specific guidance to offerors. This guidance should cover whether the
first article is a first article sample, a first production item, or the number of test items. These
documents should also include specific instructions regarding arrangements for examinations,
approval of first article test results, and disposition of first articles. Pre-solicitation documents
should provide Government waiver rights for samples for first article inspection to bidders
offering a previously acquired or tested product. Bidders offering such products who wish to
rely on such production testing must furnish evidence with the bid that prior Government
approval is appropriate for the pending contract.
6.5 Conformance inspection. Affordable conformance inspection with confidence varies
depending upon a number of procurement risk factors. Some of these factors include: Contractor
past performance, Government schedules and budget, product material and design maturity,
manufacturing capital equipment and processes applies, the controlled uniformity of those
processes, labor skill and training, and the uniformity of measuring processes and techniques.
During the solicitation, contracting documents should indicate those tests desired from table II
and their designated frequency based on a risk assessment for the procurement.
6.6 Definitions.
6.6.1 Load capacity. The term used to indicate dust load has caused the air cleaner
restriction to reach 20 in. of water (4.98 kPa).
6.7 Changes from previous issue. The margins of this specification are marked with
vertical lines to indicate where changes from the previous issue were made. This was done as a
convenience only and the Government assumes no liability whatsoever for any inaccuracies in
these notations. Bidders and contractors are cautioned to evaluate the requirements of this
document based on the entire content irrespective of the marginal notations and relationship to
the last previous issue.
18
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business