MIL-PRF-62309G
TABLE III. Verification methods.
Conformance
First Article
inspection
Acceptance
tests
Control
Title
Requirement
Inspection
12345
(100%)
Tests
3.2 thru 3.2.2
XXXXX
X
Materials
3.2.3
4.3.2
XXXXX
X
Design and
construction
XXXXX
X
Defects
(see table IV)
Seal
3.2.3.1
4.3.2.1
XXXX
X
Seal compression
3.2.3.1.1
4.3.2.1.1
X
X
Seal adhesion
3.2.3.1.2
4.3.2.1.2
X
X
X
Media
3.2.3.2
4.3.2.2
XXXX
X
Internal tear
3.2.3.2.1
4.3.2.2.1
XX
X
strength
Bursting strength
3.2.3.2.2
4.3.2.2.2
XX
X
Tensile breaking
3.2.3.2.3
4.3.2.2.3
XX
X
strength
Pin loading
3.2.3.3
4.3.2.3
X
End loading
3.2.3.3.1
4.3.2.3.1
X
X
X
X
X
Maximum loading
3.2.3.3.2
4.3.2.3.2
X
X
X
X
X
Nominal loading
3.2.3.3.3
4.3.2.3.3
X
X
X
X
X
Element protection
3.2.3.4
4.3.2.4
X
X
X
X
X
1/
3.3
4.3.3
Operating
requirements
Initial airflow
3.3.1
4.3.3.1
XXXXX
X
X
requirements
Dust capacity
3.3.2
4.3.3.2
XX
X
Dust efficiency
3.3.3
4.3.3.3
X
XX
X
3.4
4.3.4
Interface
requirements
Filter element
3.4.1
4.3.4.1
X
Master box
3.4.2
4.3.4.2
X
assembly
Weight
3.4.3
4.3.4.3
XXXXX
Metals
3.4.4
4.3.4.4
X
3.5
4.3.5
Ownership &
support
requirements
Air cleaning
3.5.1
4.3.5.1
X
durability
Washing durability
3.5.2
4.3.5.2
X
10
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business